Groundworks in Redhill
For a Redhill extension the first job is finding out what the footing will sit in. Near the station the Folkestone sand often gives good bearing at a modest depth, but on the Weald Clay around Earlswood and Salfords, or the Gault north of the town towards Merstham, building control may ask for deeper trench fill, particularly where there are established trees in the garden or next door. Low ground beside the Redhill Brook can need a raft or piled design from an engineer.
We dig, pour and build up strip, trench fill and raft foundations, and lay oversite slabs and concrete bases for extensions, garages and outbuildings. The trench stays open and clean until building control has inspected it, then concrete is placed straight away so rain cannot soften the formation. On terraces and semis where the new work goes close to the neighbour's foundations, the Party Wall etc. Act 1996 notice needs to be in place before we start.